ZIES207 Epoxy Zinc-rich Shop Primer belongs to zinc-rich primers and the epoxy system. It is used as a holding primer for steel after abrasive blasting, with a holding period of 9–12 months; it can also be used as an anticorrosive coating for galvanized sheet. After film formation, this primer provides excellent anti-rust performance and cathodic protection, resistance to heat, oil and water on contact, good adhesion, and minimal burn-off during welding and cutting; the coating does not affect welding performance. Two-pack, grey, epoxy zinc-rich shop primer. Parameters on this page: dry film thickness 20 µm equivalent to 65 µm wet film, theoretical spreading rate 8 m²/kg, number of components two-component.
Parameter source: OSAKA original technical data sheet (TDS) “ZIES207 Epoxy Zinc-rich Shop Primer”; values such as spreading rate are converted from TDS parameters and are for selection reference only.
The above content is compiled from the manufacturer's datasheet and this site's parameter tables. For selection, coating systems and lead times, pleaseContact Usfor confirmation.
This page carries the full TDS for this product, translated from the manufacturer's original document. No file download is needed; for an original-language copy, send an enquiry.
| Volume Solids | 30% |
|---|---|
| Dry Film Thickness | 20 µm corresponds to 65 µm WFT |
| Theoretical Spreading Rate | 8 m²/kg |
| VOC | 602 g/L |
| Density / Specific Gravity | Approx. 1.9 kg/L |
| Number of Components | Two-component |
| Flash Point | 24°C |
| Thinner | OUP 106, recommended addition 3%–5% |
| Mixing Ratio | Component A : Component B = 10:1 (by weight) |
Two-pack, grey, epoxy zinc-rich shop primer
Used as a holding primer for steel after abrasive blasting, with a holding period of 9–12 months; can also be used as an anticorrosive coating for galvanized sheet. After film formation, this primer provides excellent anti-rust performance and cathodic protection, resistance to heat, oil and water on contact, good adhesion, and minimal burn-off during welding and cutting; the coating does not affect welding performance.
| Volume Solids | 30% |
|---|---|
| Dry Film Thickness | 20 µm corresponds to 65 µm WFT |
| Theoretical Spreading Rate | 8 m²/kg |
| Practical Spreading Rate | Allowing a suitable loss |
| Volatile organic compound content | 602 g/L |
| Mixing Ratio | Component A : Component B = 10:1 (by weight) |
|---|---|
| Airless spray | Recommended: nozzle tip size: 0.38–0.53 mm; fluid pressure: 12–15 MPa. |
| Brush or roller | Recommended |
| Conventional spray | Suitable, but not recommended. |
| Thinner | OUP 106, recommended addition 3%–5% |
| Paint equipment cleaner | OUP 106 |
| Pot life | 23 °C: 8 h |
| Drying Time | ||||
| Substrate Temperature | Touch dry (min) | Hard dry (minutes) | Recoat Interval | |
| Minimum | Maximum | |||
| 5°C | 12 | 60 | 30 h | 6 months |
| 23°C | 5 | 30 | 16 h | 6 months |
| 35°C | 2 | 20 | 10 h | 6 months |
| Storage | Store in a cool, dry environment |
|---|---|
| Shelf life | 1 year |
| Packaging Specifications | A: 30 kg in a 20 L drum B: 3 kg in a 4 L drum |
| Flash Point | 24°C |
| density | Approx. 1.9 kg/L |
Steel surface: abrasive blast cleaning to ISO 8501: 2007 grade Sa2.5, or hand or power tool cleaning to grade St3.
Recommended number of coats: one coat by high-pressure airless spray, dry film thickness 15–20 µm. Subsequent coats: epoxy resin coatings, epoxy tar coatings, chlorinated rubber coatings, alkyd resin coatings, phenolic resin coatings, chlorosulfonated polyethylene anti-corrosion coatings, high chlorinated polyethylene anti-corrosion coatings and other coatings.
Information is subject to the manufacturer's latest version; the manufacturer's latest TDS prevails.
The technical parameters on this page are taken from the product's original manufacturer technical datasheet, the copyright of which belongs to the manufacturer. If a rights holder considers the presentation inappropriate, contact us for verification and handling.